top of page

News


Annual System Performance Report Now Available
SGWASA’s wastewater treatment plant has a design capacity of 5.5 million gallons per day, while the collection system includes approximately 154 miles of sewer piping and 48 wastewater pumping stations. Each pumping station is equipped with standby power and a monitoring system designed to track operating conditions and generator status.
Jul 27


Drinking Water Week: Official Reports Tell the Story Behind Water Service at SGWASA
Reports Tell the Story Behind Water Service at SGWASA
May 6
bottom of page
