top of page
8th Street Blasting and Asphalt Repairs Scheduled Today
September 8, 2026
CP-1 Updates
Haren is advancing work at the Joe Peed lift station. Along Joe Peed Road, JF Wilkerson is installing sewer line while Autry performs sewer force main work.
CP-2 Updates
Park is excavating on A Street. Young Construction has a limited crew onsite. Replacement cutting discs are expected to arrive this week, with the date to be determined. Once installed, boring operations will resume.
Carolina Drilling is scheduled to conduct two controlled blasts today on 8th Street at 11:00 AM and 3:00 PM.
ASD is onsite completing full-depth asphalt repairs in areas affected by work on A Street, Laundry Avenue, 19th Street, and 22nd Street.

bottom of page