A Street Restoration Preparation Continues as Jack-and-Bore Equipment Breakdown Begins
9 de octubre de 2026
CP-1 Updates
Haren continues work at the Joe Peed lift station.
Along Joe Peed Road, JF Wilkerson continues sewer line installation, while Autry continues sewer force main construction.
CP-2 Updates
Park continues cleanup on A Street and preparation for base coat asphalt. Crews are also continuing to move excavation equipment to 8th Street and resuming vacuum testing of recently installed manholes.
Young Construction continues dismantling the tunnel boring machine (TBM).
A second Young Construction crew has completed the jack-and-bore operation and will begin breaking down the associated equipment.
No blasting will occur today. Carolina Drilling plans to resume blasting activities Monday.