Pipe Installation Returns to 8th Street as Railroad Avenue and Microtunnel Work Continue

9 de noviembre de 2026

CP-1 Updates
Haren continues construction at the Joe Peed lift station. Along Joe Peed Road, JF Wilkerson remains focused on sewer line installation, while Autry proceeds with installation of the sewer force main.

CP-2 Updates
Park Construction will resume pipe installation on 8th Street, with additional pipeline work continuing along Railroad Avenue. On C Street, crews will excavate an air gap around the existing gas line to support construction activities.

Carolina Drilling is scheduled to conduct one controlled blast today at 1:00 PM.

Young Construction continues threading pipe through the microtunnel casing, advancing the underground pipeline installation.

As work continues across these locations, SGWASA encourages motorists to remain attentive to changing conditions near active construction zones and follow posted traffic guidance.