Middleton Drive Force Main and Eighth Street Installation
31 de marzo de 2026
CP-1
Haren crews are continuing pipe installation at the Joe Peed site. JFW crews are continuing 16-inch force main installation along Middleton Drive. Autry crews are potholing along West Middleton Drive.
CP-2
Park crews are continuing 36-inch FRP installation from Manhole 5758 up Eighth Street. Carolina Drilling crews will not conduct blasting for the remainder of the week.