top of page
Joe Peed Pipe Installation and Revised CP-2 Blasting Schedule
20 de marzo de 2026
CP-1
Haren crews are continuing pipe installation at the Joe Peed site. JFW crews are continuing 16-inch force main installation along East Middleton Drive.
CP-2
Park crews are continuing 36-inch FRP pipe installation across D Street. Carolina Drilling crews will conduct one blast at the microtunnel receiving pit at 12:00 pm. On D Street, crews will conduct one hand shot at 11:00 am.
The previously planned 3:00 pm D Street blast has been canceled.

bottom of page








