Middleton Drive Force Main and Spoil Removal Activities

2 de abril de 2026

CP-1
Haren crews are continuing pipe installation at the Joe Peed site.

JFW crews will continue 16-inch force main installation along Middleton Drive.

Autry crews are installing 24-inch force main along West Middleton Drive.

CP-2
Park crews are continuing to load out spoil from the site. Crews will also begin stripping bypass pumps and removing associated piping.

Carolina Drilling crews will not conduct blasting for the remainder of the week.