Replace aging filter media and components to improve treatment performance and reliability at the Water Treatment Plant.

Presupuesto:

$700K construction - $245K design

Hito actual:

With Filter 1 completed, filter 2 excavation activities are beginning.

First basin has been restored and construction remains ongoing through Spring 2026. The Board of Directors awarded a construction contract to State Utility Contractor at the August 12, 2025 Board of Directors meeting. The filter media material was ordered following Board approval. The construction on the project started in November. The first water filter basin was taken out of service in December and will be put back into service in early January. The project will be completed in the spring of 2026.

Fondos:

SGWASA Filter Media Replacement (WTP)

Hazen & Sawyer

Between May and September 2024, SGWASA encountered water production issues at the water treatment facility related to the water filtering process. The five water filters struggled to maintain their normal production levels, unable to keep up with the heightened demand that resulted from the higher-than-normal temperatures. To investigate the issues with the water filter system, SGWASA contracted Hazen, one of its on-call professional engineering firms, to conduct a detailed examination. Hazen completed their detailed investigation and recommended the following improvements and optimizations for the filter operations at the SGWASA Water Treatment Plant (WTP):

Filter media replacement: The existing filter media is 22 years old, which exceeds the industry standard for media life of 10-15 years and should be replaced immediately.

Rehabilitation of SGWASA Filters: The underdrain nozzles in the filter vessels should be further inspected and any failed or broken nozzles should be replaced.

Consider Replacing Backwash Supply Pump: The existing backwash pump is not capable of achieving the needed filter media expansion of 30% to provide proper removal of solids

Monitor Media Depths. Plant Operations should plan to monitor media depths annually to track media loss.

Source Water Algae Monitoring Program. Since algae enumerations indicated the presence of known filter clogging species, a routine algal monitoring program beginning in 2025 is recommended.

Modify the backwash procedure. To combat solids retention, it is recommended that the backwash procedure be modified to increase the duration of the high-rate portion of the water backwash.
Based on the recommendations contained in the technical report, SGWASA asked Hazen to develop a scope and fee for the filter media replacement project.

Más información

Esta sección proporciona documentos de apoyo y multimedia relacionados con el proyecto. Los recursos a continuación consolidan información clave sobre el proyecto y temas estrechamente relacionados que orientan la planificación, el cumplimiento normativo y la coordinación.


Apoyo y recursos para proyectos

Utilice los enlaces rápidos de ingeniería para navegar fácilmente a la información del proyecto, comunicarse con el equipo del proyecto y ver los archivos del proyecto.

bottom of page