The study will evaluate organizational facility needs over the next 30 years and define a prioritized plan.

The Facility Needs Study was completed in December of 2025 with a formal Board update forthcoming.

Fondos:

SGWASA Facility Needs Study

Various

The organizational-wide facility needs study evaluates SGWASA’s current facilities and determines future facility needs for the next 30 years. This study focuses on several operating departments, such as administration, located in the Butner Town Hall, the wastewater treatment plant, and the water/sewer utilities operations. As separate AIA study is being performed for the water treatment facility master plan. McGill Associates is performing both studies. The cost for the Facility Needs study is $43,718.00. The Board of Directors will be provided with a final report/overview in the fall of 2025.

Presently, SGWASA has a 20-year lease with the Town of Butner. The lease originated in 2011.

Más información

Esta sección proporciona documentos de apoyo y multimedia relacionados con el proyecto. Los recursos a continuación consolidan información clave sobre el proyecto y temas estrechamente relacionados que orientan la planificación, el cumplimiento normativo y la coordinación.


Evaluate organizational facility needs over the next 30 years and define a prioritized plan.

Apoyo y recursos para proyectos

Utilice los enlaces rápidos de ingeniería para navegar fácilmente a la información del proyecto, comunicarse con el equipo del proyecto y ver los archivos del proyecto.

bottom of page